The wind park consists of 18 wind turbines placed on steel towers 95m high. The foundation of wind towers is on 33 drilled concrete piles.
Construction period:
2013.
Client:
“Vat Energija D.o.o” Negotin
Location:
Negotin, Serbia
WP Kladovo Project
The wind park consists of 25 wind turbines placed on steel towers 92m high. The foundation of wind towers is on 27 drilled concrete piles.
Construction period:
2012 – 2013.
Client:
“Forestpeak-I” d.o.o. Kladovo
Location:
Kladovo, Serbia
project involvement
Third Party Technical Control
WP Cibuk 1 Project
The wind park consists of 57 wind turbines placed on steel towers. Technical control of design for changing the building permit for the infrastructure complex of the wind farm Čibuk 1.
Construction period:
2018.
Client:
“Vetroelektrane Balkana” d.o.o Belgrade
Location:
Kovin, Serbia
WP Kovacica Project
The wind park consists of 37 wind turbines placed on steel towers 120m high. Tower foundations are foundation pads with 20m in diameter
Construction period:
2015.
Client:
“Elektrawinds K-Winds” d.o.o New Belgrade
Location:
Kovacica, Serbia
WP Krivaca Project
The wind park consists of 32 wind turbines placed on steel towers 117m high. Tower foundations are foundation pads 20m in diameter.