The building is a steel structure coated in Alu bond, with a concrete garage under it. In the design phase of the project-specific tasks were: Detailed design of the steel structure, Check structural analysis and calculations, Workshop drawings, Also providing Consulting services to the Client on procurement. Total area of the building is around 12.000 m2 Value of the project: 8.000.000 EUR
Project Details
Construction period:
2005.
Client:
Immobilia, Belgrade
Location:
New Belgrade, Serbia
Description:
Main Structural Design and Supervision of the Works