The wind park consists of 18 wind turbines placed on steel towers 95m high. The foundation of wind towers is on 33 drilled concrete piles.
2013.
“Vat Energija D.o.o” Negotin
Negotin, Serbia
The wind park consists of 25 wind turbines placed on steel towers 92m high. The foundation of wind towers is on 27 drilled concrete piles.
2012 – 2013.
“Forestpeak-I” d.o.o. Kladovo
Kladovo, Serbia
project involvement
The wind park consists of 57 wind turbines placed on steel towers. Technical control of design for changing the building permit for the infrastructure complex of the wind farm Čibuk 1.
2018.
“Vetroelektrane Balkana” d.o.o Belgrade
Kovin, Serbia
The wind park consists of 37 wind turbines placed on steel towers 120m high. Tower foundations are foundation pads with 20m in diameter
2015.
“Elektrawinds K-Winds” d.o.o New Belgrade
Kovacica, Serbia
The wind park consists of 32 wind turbines placed on steel towers 117m high. Tower foundations are foundation pads 20m in diameter.
2015.
“Ivicom Energy” d.o.o Zagubica
Golubac, Serbia