The Work on the reconstruction and restoration of the monument “TABULA TRIANA,” which was dislocated in 1968 due to the construction of the Đerdap Hydropower Plant.
Project Details
Construction period:
2020 – Ongoing
Client:
Institute for the Protection of Cultural Monuments of Serbia
Location:
Tekija, Serbia
Description:
Preparation of the Design for the static restoration