The structure of the Office Building was designed with composite columns and concrete slabs. Foundations were bored concrete piles with slabs. During the Design Phase, specific tasks were: structural analysis, all necessary calculations, workshop drawings, specifications, and bill of quantities. The total area of the building is around 50.000 m2 Consulting services to a client on procurement value of the Contract: 45.000.000 €
Project Details
Construction period:
2006 – 2009.
Client:
DOMAA, Belgrade, Serbia
Location:
New Belgrade Serbia
Description:
Tender preparation Detail structural design Monitoring Author Supervision of the works