This facility for finishing works was designed within the business complex GOŠA FOM in Smederevska Palanka. The hall is planned for blasting and painting operations and packing and loading finished workpieces into vehicles for further transport. The main supporting structure of the hall was designed as a system of steel roof truss girders resting on steel columns. The production process serves a crane with a load capacity of 400/50 kN. An annex hall with administrative functions was also designed.
Main span 33.75m The span of the annex building is 4.725m Height 16.0m Length 81.0 m Total GBA: 3.000m2
Project Details
Construction period:
2012–2013.
Client:
GOŠA FOM a.d. Smederevska Palanka, Serbia
Location:
GOŠA FOM factory Smederevska Palanka, Serbia
Description:
Preliminary Structural Design / Detailed Structural Design / Author supervision / Consulting services to the Client on procurement