GTC PARK, Apartments Block 19A, Belgrade, Serbia

Return to all projects
Construction period Client Location Description Author
2006 -2008 GTC International Development Israel Belgrade Serbia

Tender preparation

Preliminary and

Detailed Structural design

Author Supervision of works

Božidar Putniković,arch.

Moti Kassif, arch.

Structure of the Building was designed with composite columns and concrete slabs. Foundations were bored concrete piles (diameter 600-800 mm), with slab. During the Design Phase specific tasks were: structural analysis, all necessary calculations, work shop drawings, specifications, and bill of quantities. Total area of the building is around 60.000 m2 Consulting services to client on procurement Value of the Contract: 30.000.000 EUR
About Project